A Few Quick Facts & Memorial Day
- Sally B. Philips
- May 22, 2020
- 2 min read

Vol. 1, No. 26 May 22, 2020
SoMi MARKET
I found out that (1) the engineering drawings of how the building will be built - which are necessary in order to get a building permit - will take 12 - 18 months, and (2) that from the time of ground-breaking until the time a grocery store could move back in, might be as short as a year. That is, if the concept is approved at the second reading. There is no guarantee that it will be Winn-Dixie, but since they were heavily involved in the design of the loading area, I am encouraged to believe that they will want to move into this new, enlarged space. And (3) most of the delivery trucks come before the peek morning rush hour - that is, before 7:00 am.
MEMORIAL DAY WEEKEND
WORKOUT BY ZOOM
This is a good time to get some group exercise in without letting anyone see you: no way to embarrass yourself. Baptist Health is providing online Zoom classes:

For more information and details, click on Events.BaptistHealth.net.
METRO DADE TRANSIT
Different schedules will be in effect this weekend:

Tri-Rail trains will run 5-car sets starting Friday, May 22nd, in preparation for increased train service due to the reopening of business in Miami-Dade, Broward and Palm Beach counties. To access the current Tri-Rail and Commuter Connector schedules, please visit www.tri-rail.com or call 1-800-TRI-RAIL (874-7245).
FOOD DISTRIBUTION

Comments